EcoSeal

Sealed envelopes for energy-efficient buildings.

Closed-cell spray foam and building envelope advisory for homeowners, builders, and MURB developers across the BC Interior. Performance you can measure with a blower door.

0.20L/s/m²
Park Edge Vernon blower door — among the best wood-frame MURB results on record in BC.
345units
MURB units insulated under EcoSeal contract across three buildings — Park Edge Vernon, Cascara Salmon Arm, and Maple Ridge.
50MLI pts
CMHC MLI Select energy points captured at Step 3 — the BC Step Code shortcut to Level 3.
4 buildings
with West Urban
Solutions

Performance pathways for the building envelope.

From spray foam at the core to fully-coordinated envelope contracts, we deliver assemblies that cut energy use, hit BC Energy Step Code, and earn FortisBC and CMHC financing benefits.

Two-pound closed-cell spray polyurethane foam. Six-plus R per inch and a continuous air barrier in one application. CAN/ULC certified. The same product that delivered 0.20 L/s/m² on Park Edge Vernon.

Learn more

Closed-cell SPF for 4+ storey rental apartment buildings targeting BC Energy Step Code 3 and Step 4. Spec letter to your energy modeller before the permit model is built so the assembly is in the model.

Learn more

Pre-construction envelope advisory for MURB developers. FortisBC CNC enrollment before above-ground construction. Step Code declaration oversight. CMHC MLI Select energy points scoring.

Learn more

Warehouses, cold storage, light industrial. Single contract, scheduled crew, blower door verification when the project calls for it.

Learn more

Spray foam on attic floors, roof decks, crawlspace walls, and rim joists. Stops air movement, stops cold floors, qualifies for airtightness incentives where available.

Learn more
Request audit
What we deliver

Building envelope, engineered to last.

Measured assemblies, real numbers, and continuous-coverage contracts. No guesswork on R-value, no guesswork on airtightness.

Measured

Built on data, blower door tests, and the actual BETBG thermal bridging methodology — never guessed.

Scoped

From single retrofits to full-storey MURB envelopes. One contract end-to-end.

Sealed

Continuous air, vapour, and thermal control. Aligned with BC Energy Step Code 3 and 4 targets.

Documented

Spec letters to your energy modeller. Step Code declarations supported. Lender-ready.

Key figures

Numbers from real buildings.

Confirmed performance and rebate capture data from West Urban MURB projects in the BC Interior.

0.20L/s/m²
Park Edge Vernon facade blower door at 75 Pa — among the best wood-frame MURB results in BC.
$156,650
FortisBC CNC capital incentive available on Park Edge — the rebate that goes with a Step 4 declaration.
21%
Park Edge TEUI margin over Step 3 target — Step 3 declared, TEUI 94 kWh/m²/yr.
50MLI pts
CMHC MLI Select energy points unlocked at Step 3 via the BC Step Code shortcut.
Read the full story