What we do
Single-contract building envelope work on Part 3 MURBs — air barrier, thermal layer, vapour control, and the spec letter that goes to your energy modeller.
Why this matters for Kelowna
BC Energy Step Code 3 is the minimum on every new Part 3 permit from January 1, 2026. Step 3 maps directly to 50 CMHC MLI Select energy efficiency points via the BC Step Code shortcut. That is the full energy cap. Stack with affordability or accessibility points to reach the 100-point premium discount tier.
How we work with energy modellers
The model is only as good as what the contractor tells the modeller. We send a written spec letter to your energy modeller before the permit model is built so the assembly is in the model, not assumed from the drawings.
